Liquid Fertiliser Line Capacity
Capacity is not the biggest machine; it is daily tonnage divided by shift time, with the bottleneck found.
Technical summary
Ton/day
input
Shift
time
Nozzle
output
Packaging
limit
Order of calculation
Write daily tonnage and shift hours first. Then measure cycle time per pack: fill + placement + cap.
If the result exceeds the target, add a nozzle or raise automation. The bottleneck decides, not the machine rating.
- ✓Daily tonnage to shift
- ✓Pack cycle time
- ✓Bottleneck detection
- ✓Nozzle or automation
Frequently asked questions
How many litres per minute?+
Daily tonnage divided by working minutes.
Is a nozzle enough?+
If filling is the bottleneck yes; if handling is, add a station.
Season peaks?+
A second nozzle or shift is evaluated before new investment.