Capacity is not the biggest machine; it is daily tonnage divided by shift time, with the bottleneck found.

Technical summary

Ton/day

input

Shift

time

Nozzle

output

Packaging

limit

Order of calculation

Write daily tonnage and shift hours first. Then measure cycle time per pack: fill + placement + cap.

If the result exceeds the target, add a nozzle or raise automation. The bottleneck decides, not the machine rating.

  • ✓Daily tonnage to shift
  • ✓Pack cycle time
  • ✓Bottleneck detection
  • ✓Nozzle or automation

Frequently asked questions

How many litres per minute?+

Daily tonnage divided by working minutes.

Is a nozzle enough?+

If filling is the bottleneck yes; if handling is, add a station.

Season peaks?+

A second nozzle or shift is evaluated before new investment.